Well, a slight hiccup yesterday delayed the final installation of these doors. I'll own up to the oversight - it was mine.
When designing, planning or fabricating, I like to have small reveals. This means I wanted an ever so slight gap between the bottom of the door frames and the tiled floor in front of them. Well, I failed to account for the bowing in the tile. On Friday, the doors would only open a foot or so before becoming bound up. To remedy this, I had to cut out a 1" section on each of the vertical uprights, weld them back together and grind 'em smooth.

With that done late Friday night, I left them outside overnight to rust the bare metal areas I had just ground. DB helped with the install again today and everything went off without a hitch...like it was supposed to on Friday.

Above is the view from the gallery looking into the back area. Below is a shot looking out into the gallery. Zart 1312 owner, Maribeth Trevillyan, adorned the backsides of the doors with fabric in order to completely block off view into the back room. We'll get some pics of that in the near future...

Thanks to Maribeth, DB, Kevy and as always, Bob Wagaman(!) for their help/input/support in one form or the other...It's always appreciated...


3 comments:

Courtney said...

Those doors are beautiful!

Single Stone Studios said...

These doors are so cool! Worth all the time and effort to install them!!

Boonie said...

Thanks...both of you!