2.14.2011
The Lift
The original sign for The Lift (see above), on 4th St. in downtown Des Moines, is a little worn out. Here's the work being done on the new one. The background is a 4/4 cypress wood glue-up. The framework, scroll work and lettering is all 1/8" mild steel that was cut on a water jet. The steel is attached with 1/4" x 20 NC studs through the wood. This'll be an improvement for the long haul indeed. Thanks to TJ and 'Deo...
Labels:
carpentry,
fabrication,
party
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment