Here's a 20' section of railing being built for a client in North Liberty, IA. The sections of railing are to be side-mounted to the fascia with 3/8" lags through 3/8" thick 4"x6" flanges. Tubing is 1 1/2" square with 1/2" sq. solid pickets. Finish will be a black powder coat finish.
The rails are side-mount due to the deck actually being the roof of the client's garage. The roof in turn is a rubber membrane, so putting holes in it is being avoided for obvious reasons.
This photo is at the beginning of the build. Fabrication is complete with only a little grinding left before having them shot. Installation should happen at the end of the week.
No comments: